|
A lot of the work within the projects in WP 8 is directly related to the work that has been conducted in the D-AIM project so far and will serve as a natural follow-up on the D-AIM project. For instance the SJU projects 8.3.3 (Identify and Develop Aeronautical Information ATM Information Services) and 8.3.6 (Identify and Develop Airport Operators ATM Information Services) are projects that will use experiences from the D-AIM project and continue to develop these and other services. Both EUROCONTROL and LFV (through NORACON) contribute signficantly to these projects but now with the big advantage of having European-wide participation from other ANSPs and Industry as well.
|